21 Sanyo Dr. Wodonga

02 6056 9068

Rapid Hydraulics and Pneumatics has the largest and most experienced team of service and sales staff between Melbourne and Sydney.
We carry an extensive range of hydraulic hose and fittings to suit all applications and our Rapid Hose service trucks are by far the best equipped hydraulic service vehicles.
Talk to us about any of our industrial product range
Team Rapid - Dedicated and Professional
Rapid Performance Plumbing are you one stop shop for any automotive plumbing products. With the facilities to manufacture ADR compliant brake lines in rubber or stainless steel braid, OEM or custom, they do it all.

West Kiewa Hydro Power Station Upgrade

The Kiewa Hydroelectric Scheme is the largest hydro-electric scheme in Victoria and the second largest in mainland Australia after the Snowy Mountains Scheme.

The scheme is situated in the Australian Alps in north-eastern Victoria about 350 km from Melbourne and is wholly owned by AGL Energy.

AGL Energy Limited conducted a major refurbishment program at its West Kiewa Power Station from March 2013 until late 2015. The refurbishment program included installing 4 new turbines and main inlet valves in the power station. In the Victorian High Country near Falls Creek.

Working as a subcontractor under Alstom, Rapid was involved in the installation of all the hydraulic hard lines from the new hydraulic power units to all 4 new turbines.

With our team of experienced tube installers and our electric bender and great team work with the Alstom team, Rapid was able to deliver under time and under budget by the end of the final install of the last Turbine.

Our guys quite enjoyed the work away especially working in such a beautiful environment, plus living in a lovely unit in Mt Beauty on the Kiewa River for the duration of the project.

Find us on the  Billboard