21 Sanyo Dr. Wodonga

02 6056 9068

Rapid Hydraulics and Pneumatics has the largest and most experienced team of service and sales staff between Melbourne and Sydney.
We carry an extensive range of hydraulic hose and fittings to suit all applications and our Rapid Hose service trucks are by far the best equipped hydraulic service vehicles.
Talk to us about any of our industrial product range
Team Rapid - Dedicated and Professional
Rapid Performance Plumbing are you one stop shop for any automotive plumbing products. With the facilities to manufacture ADR compliant brake lines in rubber or stainless steel braid, OEM or custom, they do it all.

Bogong Hydro Power Station

The Kiewa Hydroelectric Scheme is the largest hydro-electric scheme in Victoria and the second largest in mainland Australia after the Snowy Mountains Scheme.

The scheme is situated in the Australian Alps in north-eastern Victoria about 350 km from Melbourne and is wholly owned by AGL Energy.

Bogong Power Station is located near Bogong Village at the base of Lake Guy in the Alpine National Park of Victoria. It was commissioned in November 2009 and is owned and operated by AGL Energy.

It is the largest hydropower project in the country in the last 27 years.

The $240m project provides 140MW of ultra-fast power during peak demands.

It generates about 94,000MWh while eliminating 88,000t of greenhouse gas emissions a year.

At the same time it provides economic and recreational benefits to the region.

Bogong power station is the fourth and last hydro project added to the Kiewa hydroelectric scheme, situated 300km north-east of Melbourne. The other three projects of the scheme are McKay Creek power station, Clover power station and West Kiewa power station.

Subcontracting under DTD Engineering who was the main contractor under Toshiba International. Rapid Hydraulics role was to install all stainless hydraulic lines for this new Hydro power station. Consisting of two hydraulic power units controlling two 70MW Francis turbines. Our part of the contract involved three tradesmen tube fitters for a period of three months.